The role of logistics in modern inventory management is to turn a stock plan into goods that are in the right place at the right time, and to tell the planner honestly how long that takes and how much it varies. Inventory policy sets what you want to hold. Logistics decides what you must hold, because the time goods spend on the way, and the uncertainty around that time, determine how much stock covers the gap. This guide explains how lead time and its variability set safety stock, how the frequency of shipments trades freight against holding cost, who carries the risk of goods in transit, how money and customs rules shape inventory, and which numbers logistics should give the planner. Worked examples use made-up figures.
For the reorder-point basics, see how retailers can improve inventory planning through better logistics. For the policy choice, see just-in-time vs just-in-case inventory strategies.
Logistics Sets the Lead Time
A reorder point is the demand during the lead time plus a safety stock. The lead time is not one number. For an import from China it is the sum of production, inland haulage in China, port handling, the ocean voyage, port handling in India, customs release, inland delivery and receiving at your warehouse. Logistics influences the later items, and the Indian customs step is measured.
| Step | What drives its length | Official figure, where one exists |
|---|---|---|
| Customs release at an Indian seaport | Advance filing, queries, duty payment | Average 79 hours 4 minutes (bills filed 1 to 7 January 2025, National Time Release Study 2025) |
| Gate-out after out-of-charge | Transport and storage planning, free time, importer behaviour, coordination | Average 27 hours 26 minutes at seaports, 84 hours 50 minutes at inland depots |
| Inland delivery | Mode, distance, handling | Compare quotes for your lane |
| Receiving | Dock capacity, paperwork, counting | Measure at your own warehouse |
The figures come from the National Time Release Study 2025 of the Central Board of Indirect Taxes and Customs, which measures release time from arrival of goods to the out-of-charge order for bills of entry filed in the first week of January 2025. The same study found that a bill of entry with a single query averaged nearly 170 hours at seaports and one with multiple queries over 256 hours. The averages are useful, but the spread is what drives safety stock.
Variability Costs More Than the Average
Take a made-up product with daily demand of 40 units, an average lead time of 30 days and a longest recent lead time of 38 days. A simple safety stock covers the gap between the longest and the average lead time.
| Item | Before | After logistics improvements |
|---|---|---|
| Average lead time | 30 days | 30 days |
| Longest lead time seen | 38 days | 33 days |
| Safety stock (longest minus average, times 40) | 8 times 40, which is 320 units | 3 times 40, which is 120 units |
| Demand during the average lead time | 30 times 40, which is 1,200 units | 1,200 units |
| Reorder point | 1,520 units | 1,320 units |
The average did not change, yet the reorder point fell by 200 units because the spread narrowed. If a unit costs 50 and holding stock costs 20% a year (both made up), those 200 units are worth 10,000 and cost 2,000 a year to hold. The method is a simple one, and statistical methods give finer answers, but the lesson holds: reduce the variability and you can hold less stock for the same service level. Actions that narrow the spread include filing the bill of entry before arrival, correct documents that avoid queries, a truck booked for the expected arrival and shipment tracking, as explained in our guide to shipment tracking and supply chain visibility.

Order Frequency: Freight Against Holding Cost
Shipping more often lowers the stock you hold between deliveries but raises the freight bill. A made-up example shows the trade-off. Annual demand is 14,400 units, a unit costs 50 and holding costs 20% a year, so holding one unit for a year costs 10. Each shipment has a fixed cost of 500.
| Policy | Shipments a year | Units per shipment | Average cycle stock (half a shipment) | Holding cost | Fixed shipment cost | Total |
|---|---|---|---|---|---|---|
| Monthly | 12 | 1,200 | 600 | 6,000 | 6,000 | 12,000 |
| Twice a month | 24 | 600 | 300 | 3,000 | 12,000 | 15,000 |
Halving the shipment size saves 3,000 in holding cost but adds 6,000 in shipment cost, so the more frequent policy costs 3,000 more in this example. Different numbers can flip the answer, for instance when goods are valuable and freight is cheap or when consolidated LCL cargo makes small lots affordable in your case (check the quotes). Our guide to freight consolidation covers that case.
Who Carries the Risk of Goods in Transit
Stock in transit is inventory that you cannot touch, so you need to know who bears the risk. An ICC Academy article on DAP and DDP says that under DAP the buyer must manage and pay for all import clearance formalities and bears all risks of loss or damage during the import clearance process, while under DDP the seller is ultimately responsible for the import clearance process. Under any term, ask exactly where risk passes and who insures the goods at each stage.
For insurance, ICC's report on national regulatory barriers records that India allows foreign transport insurance for CIF and CIP until the point of entry but not for subsequent transport into the country. The inland leg of a CIF or CIP shipment may therefore need separate cover in India. See our guide to cargo insurance for China-origin shipments and EXW vs FOB vs CIF.
Money in Transit and Customs as Inventory Tools
The Reserve Bank's Master Direction on Import of Goods and Services expects remittances against normal imports to be completed within six months from the date of shipment, with exceptions set out in the Direction, and requires evidence of import. Payment terms affect how much cash is tied up in goods you cannot yet sell.
Customs offers two levers. First, bonded storage can let an importer defer duty until goods are cleared for home consumption, so confirm with your customs broker how clearance and duty timing work for your goods. Para 2.36 of the Foreign Trade Policy 2023 allows goods other than prohibited items, arms and ammunition, and hazardous waste and chemicals to be warehoused in bonded warehouses, with duty paid at clearance for home consumption. Our guide to how warehousing supports international distribution works through an example. Second, the National Time Release Study 2025 describes deferred duty payment as a privilege of Authorized Economic Operators in Tiers 2 and 3. It found that bills of entry with deferred payment had an average release time of 42 hours 47 minutes at seaports, against 79 hours 4 minutes overall, and that they were 9% of seaport bills of entry. Deferred payment is not open to every importer, so ask your customs broker whether you qualify.
Numbers Logistics Should Give the Planner
- The average and the longest recent lead time for each lane, by step.
- The share of shipments that arrive within the promised window.
- The days between arrival at the port and receipt at your warehouse.
- The days of stock in transit at any time.
- The reasons for every delay of more than a few days, so that causes can be fixed.
A Quarterly Review Routine
Once a quarter, replace assumed lead times with recorded ones. For each lane, list the planned and the actual lead time of every shipment, find the longest and the average, and recompute the reorder point and the safety stock. Compare the new figures with the stock you actually hold. If a lane has become more predictable, release stock or shorten the buffer. If it has become less predictable, find the cause first, because a fix at the source can be cheaper than extra stock, and then decide whether to raise the buffer in the meantime.
Align Logistics and Inventory With RR Brothers and Logistics
RR Brothers and Logistics supports importers with warehousing, sea freight from China and customs clearance in India. Share your demand and lead-time history and we will discuss which lanes and shipment sizes suit your stock plan.
Frequently Asked Questions
Logistics sets the lead time and its variability. A reorder point is the demand during the lead time plus safety stock, so longer or less predictable transit means more stock must be held to avoid running out.
Safety stock covers the gap between the longest and the average lead time in a simple method. In the made-up example, narrowing the spread from 8 days to 3 cut the safety stock from 320 to 120 units.
No. It lowers cycle stock but adds fixed shipment cost. In the made-up example, twice-monthly shipping saved 3,000 in holding cost but added 6,000 in shipment cost.
It depends on the trade term. An ICC Academy article says that under DAP the buyer bears the risk of loss or damage during import clearance, while under DDP the seller is responsible for clearance.
It can defer duty, because duty is paid as goods are cleared for home consumption (para 2.36 of the Foreign Trade Policy 2023). Bond costs, rent, handling and any interest on duty must be weighed against the deferral, so ask your customs broker to price it.
The National Time Release Study 2025 found an average of 79 hours 4 minutes at seaports for bills filed in the first week of January 2025, and nearly 170 hours when a single query was raised.
Sources
- CBIC: National Time Release Study 2025 (released 20 June 2025)
- ICC Academy: DAP and DDP, Incoterms 2020 explained
- ICC: National regulatory barriers to the Incoterms 2020 rules (January 2025)
- Reserve Bank of India: Master Direction, Import of Goods and Services (updated 12 January 2026)
- DGFT: Foreign Trade Policy 2023, Chapter 2 (para 2.36)
This article is general information, not legal, tax or customs advice. Rules, rates and procedures change; confirm current requirements with the relevant authority or a licensed customs professional before you ship. Regulatory references were checked against the official sources listed above on 26 October 2026.
Image credits: header photo by Arum Visuals on Unsplash; photo by Jakub Żerdzicki on Unsplash. Used under the Unsplash License.
Request a Quote


